# Repacking goods into another pack

Section: Stock. Address: https://vende.id/docs/stok/repack?lang=en

Split one sack into small bags, or combine several items into one pack, with the cost moving along by itself.

Shops often buy goods in a large pack and sell them in small packs. For example 1 sack of sugar of 50 kg is rebagged into 200 bags of 250 g. With **Repack**, the stock of the source goods goes down and the stock of the resulting goods goes up, with the cost moving along.

Repack comes with the extra Production feature. If its button is missing, contact the Vende team to switch it on.

> **Important:** The **Repack** button only shows for users who may record production.

## Before you start

The source goods and the resulting goods must be two different products under **Master Data → Products**, for example:

- Gula Pasir Karung 50 kg, with Sack as its base unit;
- Gula Pasir 250 g, with Pieces as its base unit.

When all you need is another unit of the same product, for example a Box of 24, you do not need a repack. Just add that unit under **Other Units**. See [Base unit, other units and main unit](https://vende.id/docs/produk-dan-harga/satuan-lain-dan-satuan-utama?lang=en).

## Recording a repack

1. Open **Master Data → Products**.
2. Press the **Repack** button (the two arrows icon) on the row of the source goods. The **Repack** button is also at the top of the product page.
3. Choose **Warehouse**.
4. In the **Source goods** section, check the product, then fill in **Unit** and **Qty**, for example 1 Sack.
5. In the **Into** section, choose the **Resulting goods**, then fill in **Unit** and **Qty**, for example 200 Pieces.
6. Read the **Cost of the resulting goods** below it. This part and the source's cost only show to holders of Sensitive Reports; anyone else just fills in the quantities, and the cost still moves along.
7. Fill in **Note** if needed, then press **Repack**.

Example: the cost of 1 sack is Rp 650.000. The result is 200 bags. The cost is spread over the 200 bags, so Rp 3.250 per bag.

## What happens next

- The stock of the source goods in that warehouse goes down.
- The stock of the resulting goods goes up, at the cost worked out above.
- The repack is recorded as a production, with its own number. The notice after saving has a **View** link to that record.

## Goods with an expiry date

When the resulting goods use batches and expiry, fill in the batch number or the date in the repack window. When it is left empty, the expiry date of the source goods is used.

## Combining goods

A repack can also go the other way. For example 12 pieces of soap are combined into 1 pack of 12 soaps, when that pack is recorded as a product of its own. Enter the source goods as 12 Pieces and the resulting goods as 1 Pack.

> **Tip:** After a repack, print labels for the new packs under **Master Data → Print Labels**. See [Printing price labels and barcodes](https://vende.id/docs/produk-dan-harga/cetak-label-harga?lang=en).

## A wrong repack

A repack is recorded as a production. If it is wrong, delete it under **Transactions → Productions**: the source goods return to stock and the resulting goods leave it again. If the resulting goods were already sold, the confirmation names the stock that goes below zero, and deleting is still allowed. The cost of the notes that used those goods is worked out again.